首页 体育内容详情
皇冠官网(www.hg108.vip)_PM says opening of MRT Putrajaya line to revitalise development along route

皇冠官网(www.hg108.vip)_PM says opening of MRT Putrajaya line to revitalise development along route

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

皇冠官网www.hg108.vip)是一个开放皇冠正网即时比分、皇冠官网注册的平台。皇冠官网(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

,Prime Minister Ismail Sabri Yaakob speaks at the launch of the Putrajaya Line Mass Rapid Transit at Stesen MRT Kampung Batu in Kuala Lumpur. – The Malaysian Insight pic by Nazir Sufari, June 16, 2022.

THE opening of the Mass Rapid Transit (MRT) Putrajaya Line is expected to trigger and revitalise development in old, existing areas, as well as areas yet to be developed, said Prime Minister Ismail Sabri Yaakob. 

He said with the opening of the new line, the government was confident that areas located along the route, such as Jinjang, Sungai Buloh, Kepong and Bandar Sri Damansara, could develop more rapidly to be on par with other areas.

“The MRT Putrajaya Line Phase 1 involves the route from Kwasa Damansara to Kampung Batu, while Phase 2, which is almost fully completed, involves the route from Kampung Batu to Putrajaya.

“The Phase 2 route will run across strategic areas including Kuala Lumpur city centre with underground stations at Titiwangsa, Kuala Lumpur Hospital, Ampang Park, Persiaran KLCC and Tun Razak Exchange (TRX),” he said at the launch of the MRT Putrajaya Line Phase 1 at Kampung Batu MRT station in Kuala Lumpur today.

Also present were Finance Minister Zafrul Tengku Abdul Aziz, Transport Minister Dr Wee Ka Siong, Minister in the Prime Minister’s Department (Economy) Mustapa Mohamed and Federal Territories Minister Shahidan Kassim. 

Ismail Sabri said the MRT Putrajaya Line was expected to become the catalyst for improving connections between residents and communities, especially those living close to the line.

“It will be easier for the people to travel and commute to work, to socialise and to access other public facilities,” he said.

The prime minister said the 57.7km MRT Putrajaya Line has 36 stations comprising 27 elevated stations and nine underground stations with a total construction cost of RM30.53 billion.

In celebration of the line’s opening, Ismail Sabri also announced one-month free rides on all public transport operated by RapidKL, namely MRT, Light Rail Transit  (LRT), Bus Rail Transit (BRT), Monorel and RapidKL buses, starting today.

“I hope members of the Malaysian Family will take this opportunity to try using public transport by parking their cars at the Park N Ride facility and take a ride on the MRT,” he said. 

Ismail Sabri said the full opening of the MRT Putrajaya Line was expected to record an initial daily passenger count of over 104,000 and was hoped to reduce traffic congestion currently plaguing the capital.

  • USDT法币交易API(www.trc20.vip) @回复Ta

    2022-11-01 00:01:58 

      澎湃新闻观察到,从两人的工作履历来看,两人曾同时被提拔,并在2个时间点同时有新的工作任命。,陈洪波由吉林银行长春分行公司银行部总经理升任吉林银行公司银行部副总经理,在同一时间,王志刚由吉林银行吉林分行综合管理部副总经理升任吉林银行零售银行部总经理助理。2019年12月,陈洪波由吉林银行公司银行部总经理调任吉林银行总行信贷与投资评审部总经理,在同一时间,王志刚由吉林银行零售银行部副总经理调任吉林银行总行个人金融部副总经理。难怪好多人夸

发布评论